×

bridge model test meaning in Chinese

桥梁模型试验

Examples

  1. At last , in order to study the practical stability performance of the xiangtan xiangjiang river four bridges , a total bridge model test was carried through
    最后,为了研究湘潭湘江四大桥的实际受力性能及稳定性,对该桥进行了模型试验研究。
  2. In order to study actuality of cfst arch bridge , based on the investigative result of " total bridge model test of chunan nanpu bridge " , the nonlinear structural internal forces , nonlinear stability and seismic resistance of large span cfst arch bridge have been studied in this paper
    针对钢管混凝土拱桥的研究现状,并结合“淳安南浦大桥整桥模型试验研究”课题的研究成果,对大跨度钢管混凝土拱桥结构内力非线性分析、非线性稳定以及抗震等方面作了具体的研究。
  3. In order to study the practical stability performance of chunan nanpu bridge , a total bridge model test was carried through . the design method of " spar to spar " modeling method was firstly introduced in this test . the test results are significant for construction and management of chunan nanpu bridge ; excessively , the test results are significant for design and construction of large span cfst arch bridge also
    该模型试验首创了“杆对杆”刚度等效法,应用于钢管混凝土桁架拱桥的模型设计和制作中,其研究成果对南浦大桥实桥的施工以及竣工后的运行有重要的应用价值,并对今后钢管混凝土桁式拱桥的试验研究(特别是模型制作) 、设计、施工具有重要的指导意义。

Related Words

  1. bridge migration
  2. bridge mode
  3. bridge model wind tunnel test
  4. bridge modulator
PC Version

Copyright © 2018 WordTech Co.